Monday – Sunday, 9:00 AM – 11:00 PM

Net Metering

Net Metering & LESCO Filing

Free Net Metering Consultation

Get expert advice on LESCO net metering application, system sizing, and documentation requirements.

Call Tech: 0318 0637648
LESCO Net Metering Service Shahdara Lahore

LESCO Net Metering & Net Billing in 2026

Net metering allows grid-tied solar system owners in Lahore, Shahdara, and Ferozewala to export surplus solar energy back into the LESCO power grid. At SG Solar Solutions, we manage the complete turnkey LESCO licensing, technical documentation, inspection, and bi-directional green meter installation process.

Complete Turnkey Net Metering Process

Our team removes the bureaucratic hassle of dealing with LESCO subdivisions by handling all filing steps end-to-end:

LESCO Application Filing

Preparing CNIC validation, LESCO load assessment, and application submission to local subdivision offices.

Engineering Diagrams & NOC

Designing certified single-line diagrams, protection schematics, and equipment compliance certificates.

Bi-Directional Green Meter

Coordination for LESCO meter testing lab inspection and fast-track bi-directional meter replacement.

Tariff Conversion & Credits

Ensuring your monthly LESCO bill reflects solar units exported against peak grid tariff units consumed.

Net Metering FAQ

Frequently Asked Questions

What documents are needed for LESCO net metering?
You need a copy of your CNIC, latest paid LESCO electricity bill, property ownership proof, and a system single-line diagram. Our team prepares all technical documentation for you.
How long does the LESCO net metering process take?
The entire application, technical audit, and bi-directional meter installation process typically takes 4 to 6 weeks. We manage all LESCO coordination on your behalf.
What is the minimum system size required for net metering?
LESCO requires a minimum 3kW system with a 3-phase electricity connection to qualify for bi-directional net metering export.
Can solar still make my LESCO bill zero in 2026?
Not usually, and anyone promising a zero bill in 2026 is working from the old rules. The NEPRA Prosumer Regulations, notified on 9 February 2026, replaced net metering with net billing for new connections: imported units are billed at the normal slab tariff, while exported units are bought back at roughly PKR 8.13 instead of the PKR 25.32 legacy rate. A well-sized system still removes most of your bill, mainly by letting you use your own generation during the day rather than by exporting. If your net metering agreement predates 9 February 2026, you keep the old rate until that contract expires.
Is there an extra fee for the green bi-directional meter?
LESCO charges a standard meter fee (approx PKR 25,000–35,000) for testing, supply, and installation of the official bi-directional green meter.

Start Your Net Metering Application Today

Let us handle all LESCO paperwork and get your system exporting power within weeks.

Call: 0318 0637648
Call Now WhatsApp